West Gate Tunnel Project
The West Gate Tunnel Project is set to be completed in late 2025. It is a major infrastructure road project that will change how drivers, pedestrians, and cyclists move across the inner west.
As we get closer to opening, we’re excited to host our interactive driving simulator at the West Gate Tunnel Information Centre during these school holidays. Families can jump into the simulator and explore what the new West Gate Freeway, two tunnels and city connections will look like. It’s an immersive 3D experience designed to be both fun and educational.
The Info Centre is located within the project’s tunnelling hub site, which visitors can enter via the eastern end of Somerville Road, Yarraville.
- If driving or walking, you can access the visitor car park and a pedestrian entrance for the east end of Somerville Road.
- By bus, catch route 409 to Yarraville Gardens/Hyde Street and walk 5 minutes along Somerville Road.
- By train, head to Yarraville or Seddon stations and walk 15 minutes (1km).
Opening hours:
- Monday to Friday: 10am to 5pm
- Saturday: 10am to 4pm
More information can be found here:
https://bigbuild.vic.gov.au/projects/west-gate-tunnel-project/community/information-centre